Scenario

This example illustrates 5 identical service pumps. They are all running at 100% capacity and have a stressful service.

TEVA CBM, Condition Monitoring


Equipment: Parallel Centrifugal Pump Sets
Failure Mode: Impellor corrosion / erosion
Detection: Loss of performance to production
- Loss of group flow.
Estimated Costs: £2,100 per unit, per hour down


 

Run to Failure

Failures per Year: 4
Downtime hours per failure 16
Overhauls per year 0
Downtime hours per overhaul 0
Production Loss Costs: £134,400

 
Time Based

Failures per Year:
1
Downtime hours per failure
16
Overhauls per year
5
Downtime hours per overhaul
3
Production Loss Costs:
£65,100

 
Condition Based

Failures per Year:
0
Downtime hours per failure
0
Overhauls per year
3
Downtime hours per overhaul
3
Production Loss Costs:
£18,900

 

Although in theory Condition Based is the most cost effective, most facilities should incorporate all three strategies. Some pieces of plant equipment are cheaper and easier to replace than monitor.

For your maintenance strategy review call us today on 01229 811000